Building in.12 is located in the western part of in.grid and offers attractive workspace options for offices and production sites. It also has a leafy rooftop garden that is an ideal place to relax and unwind.
Area
Construction site
No. of floors
Building height
Gross floor area (above ground)
The ground floor is suitable for setting up production spaces, but it could also be used as an experience centre or exhibition space. The four standard floors can accommodate flexible office solutions that meet the exact requirements of future tenants.
The pergola structure creates a sheltered open-air seating area on the roof. It can also produce electricity in combination with photovoltaic elements.
The spacious layer between the street corridor and the interior acts as a buffer against noise emissions. It also provides sheltered outdoor seating and makes it easier to maintain the building’s exterior.
With eaves at a height of 21.50 metres, the roof silhouette fits neatly in the street corridor and forms a distinctive part of the cityscape.
If the core area of this building is extended lengthwise, it can create informal zones located between the two units where people can get together for a chat.
The pergola structure creates a sheltered open-air seating area on the roof. It can also produce electricity in combination with photovoltaic elements.
The spacious layer between the street corridor and the interior acts as a buffer against noise emissions. It also provides sheltered outdoor seating and makes it easier to maintain the building’s exterior.
With eaves at a height of 21.50 metres, the roof silhouette fits neatly in the street corridor and forms a distinctive part of the cityscape.
If the core area of this building is extended lengthwise, it can create informal zones located between the two units where people can get together for a chat.
Building in.12 is designed first and foremost as an office and production site and allows flexible usage scenarios. This means that the property may be an interesting proposition for many potential tenants in services, production, etc.
It’s really easy: just get in touch with us! Together, we will discuss your individual needs and come up with the best usage scenario for you.
First construction phase (data centre) to begin in Q1/2024, second construction phase in Q3/2025, third construction phase in Q3/2026. Scheduled for completion in 2028/29.